ANALYSIS OF MAINTENANCE ACTIVITIES ON DRAG CHAIN MACHINES TO OPTIMIZE FAILURE TIME INTERVALS USING RELIABILITY CENTERED MAINTENANCE (RCM) APPROACH
DOI:
https://doi.org/10.32734/dinamis.v11i2.13746Keywords:
Chain conveyor, Drag chain, Maintenance, Reliability Centered Mintenance (RCM)., Chain conveyor, Drag chain, Maintenance,, Reliability Centered Mintenance (RCM).Abstract
Drag Chain is a material moving machine whose working method is to deliver material using a continuous dragging method. Drag chain is the optimal choice for cement production, because the chain with conveyor leaves on the right and left side drags along the bottom of the trough to transport the material in a closed state. Under these circumstances the drag chain components will tend to wear out, as the material interacts directly with the chain and can cause problems. This research will explain the maintenance process using the Reliability Centered Maintenance (RCM) approach is a maintenance system which is associated with statistics to find the value of the reliability of a component so that we can prevent failure by a combination of various actions.
Downloads
References
D. Pembimbing, “PERENCANAAN ALAT CHAIN CONVEYOR UNTUK FEEDING BAJU HASIL SABLON GUNA MENINGKATKAN PRODUKTIVITAS INDUSTRI RUMAHAN SABLON - KAOS FEEDING BAJU HASIL SABLON GUNA MENINGKATKAN,†2021.
D. I. Pt and C. Gemilang, “ANALISIS PERAWATAN MESIN CHAIN SCRAPER CONVEYOR,†vol. 7, pp. 191–199, 2022.
M. Rcm, P. Sistem, and M. Boiler, “Tugas akhir,†2022.
T. I. M. Penyusun, “Pedoman penulisan skripsi,†2020.
P. Pemeliharaan, M. Patrick, M. Corder, and M. Assauri, “Pengertian Pemeliharaan (,†pp. 28–57, 2008.
“The development and maintenance of emmetropia,†no. November 1998, pp. 83–92, 1999.
B. S. Abbas, E. Steven, H. Christian, and T. Sumanto, “PENJADWALAN PREVENTIVE MAINTENANCE MESIN B . FLUTE PADA PT AMW,†pp. 97–104.
P. Jurusan, T. Industri, and F. Teknologi, “Perancangan Sistem Perawatan Mesin Air Jet Loom (AJL) dengan Menggunakan Reliability Centered Maintenance (RCM) (Studi Kasus: PT. Primissima Yogyakarta),†2019.
J. Manajemen, M. Jufriyanto, and A. W. Rizqi, “MATRIK Perancangan RCM ( Reliability Centered Maintenance ) Untuk Mengurangi Downtime Mesin Pembuat Botol ( Studi Kasus PT IGLAS ( Persero ), Gresik ),†vol. XXI, no. 2, 2021, doi: 10.350587/Matrik.
R. A. G. A. Pratama, P. Studi, T. Industri, F. Teknik, and U. M. Magelang, “MINIMASI DOWNTIME MESIN DRYER DENGAN RELIABILITY CENTERED MAINTENANCE DI PT PAPERTECH INDONESIA UNIT II MINIMASI DOWNTIME MESIN DRYER DENGAN RELIABILITY CENTERED MAINTENANCE,†2019.
T. R. Biyanto, I. Teknologi, and S. Nopember, “OPTIMASI PERAWATAN STONE CRUSHER MENGGUNAKAN RELIABILITY CENTERED MAINTENANCE ( RCM ),†pp. 0–11.
Y. H. Nuraidin, F. Arina, and P. F. Ferdinant, “Usulan Perawatan Mesin Compressor Unit C Dengan Metode Reliability Centered Maintenance ( RCM ) Di PT . XYZâ€.
I. Zein, D. Mulyati, and I. Saputra, “Perencanaan Perawatan Mesin Kompresor Pada PT . Es Muda Perkasa Dengan Metode Reliability Centered Maintenance ( RCM ),†vol. IV, no. 1, pp. 383–391, 2019.
R. Suwandy, “ANALISA PERAWATAN MESIN DIGESTER DENGAN METODE RELIABILITY CENTERED MAINTENANCE ( RCM ) PADA PTPN II PAGAR MERBAU SKRIPSI Diajukan Untuk Memenuhi Persyaratan Dalam Memperoleh Gelar Sarjana Teknik OLEH : FAKULTAS TEKNIK UNIVERSITAS MEDAN AREA MEDAN,†2019.
K. Dringu and J. Timur, “Jurnal SENOPATI,†pp. 82–91, 2021.
S. Septyani, “PENENTUAN INTERVAL WAKTU PERAWATAN KOMPONEN KRITIS PADA MESIN TURBIN DI PT PLN ( PERSERO ) SEKTOR PEMBANGKIT OMBILIN,†vol. 14, no. 2, pp. 238–258, 2015.
Published
Versions
- 2024-03-13 (2)
- 2024-01-11 (1)
Issue
Section
Copyright (c) 2023 DINAMIS
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.