Companies in Indonesia must find the right solution in order to survive and compete in the era of globalization. Price competition is an important strategy in the competition between similar companies. Based on this, there is a need for a good understanding in the company regarding strategic financing planning in order to achieve predetermined goals efficiently. This efficiency can be characterized by minimal cost expenditure in order to obtain maximum profit. One way to get maximum profit is by implementing good inventory management PT XYZ is a train manufacturing company in Southeast Asia. The company produces various types of trains. There is a production planning for the Train XYZ project with a total production of 526 units of train components for the Side Beam for Bogie. Procurement of these raw materials, PT XYZ uses Lot for Lot (LFL) at a cost of Rp1,411,402. The use of the LFL system still has shortcomings, namely problems due to late delivery and inefficient procurement in terms of financing. The results of production planning research with several MRP methods that have been compared, it is concluded that POQ lot sizing is the most efficient procurement of raw materials other than LFL. In detail, the total cost with the POQ method amounted to Rp1,243,140 and decreased by 11.9%. The cost consists of procurement costs of Rp781,162 and storage costs of Rp461,978.

Downloads

Download data is not yet available.

References

Agusra. “Penetapan Harga Jual Pada Bofet Martabak Kubang Wadesta Bandar Buat”, Fakultas Ekonomi, Universitas Muhammadiyah Sumatera Barat, Suratno. Yuliyanto, W & Khasanah, U, Analisis Perbandingan Harga Pokok Produksi Metode Full Costing dan Variabel Costing Pada CV Gemilang Kencana Wonosobo, Jurnal E-Bis 5(1), pp 55-66, 2021.

Suratno. Yuliyanto, W & Khasanah, U, Analisis Perbandingan Harga Pokok Produksi Metode Full Costing dan Variabel Costing Pada CV Gemilang Kencana Wonosobo, Jurnal E-Bis 5(1), pp 55-66, 2021.

Kadafi, A, M & Delvina, A, “Analisis Pengendalian Persediaan Bahan Baku dengan Safety Stock Optimum Analysis Of Raw Material Inventory Control with Optimum Safety Stock”, Jurnal Forum Ekonomi, vol. 23, no 53, pp 553-560, 2021.

Uyun, S, Z, Indrayanto, A, Kurniasih, R, "Analisis Pengendalian Persediaan Bahan Baku Dengan Menggunakan Metode Material Requirement Planning (MRP) 1". Jurnal Ekonomi, Bisnis, dan Akuntansi (JEBA), vol 22, no 1, 2020.

Martha, K, A & Setiawan, P, Y, “Analisis Material Requirement Planning Produk Coconut Sugar Pada Kul-Kul Farm”, E-Jurnal Manajemen Universitas Udayana, vol 7, no 12, pp 6532-6560, 2018.

Wibowo, W, A, " Efficency of Procurement of Main Raw Materials for Pizza Makers with Economic Order Quantity (EOQ) Approach", International Journal of Social and Management Studies, vol. 3, no. 4, hh. 64-67, 2022.

Suseno & Rifa”I, M, R, “Analisis Pengendalian Persediaan Bahan Baku dengan Metode Material Requirement Planning (Studi Kasus : PT. Aneka Adhilogam Karya)”, Jurnal Cakrawala Ilmiah, vol 1, no 7, pp 1757–1768, 2022.

Zahra, Z, S & Fahma, F. (2020). “Implementasi Metode MRP untuk Pengendalian Bahan Baku Produk ABC Pada PT XYZ”, Seminar dan Konferensi Nasional IDEC 2020, 2 November 2020.

Afrinda, D, P & Fahryan, M, “Perencanaan Produksi Lampu Emergency pada Material Requirement Planning dengan Menggunakan Metode Algoritma Wagner Within dan Economic Order Quantity (EOQ)”, TALENTA Conference Series, seri 6, pp 952-959, 2023.

Utama, R, E, Jaharudin, N, A, G, Priharta, A, “Manajemen Operasi”, Universitas Muhammadiyah Jakarta, Jakarta, 2019.

Juniarti, T, A, Luxviyanta, C, A, “Metode Pengendalian Persediaan dengan MRP”, CV Pena Persada, Purwokerto, 2021.

Abd”rachim, E, A,“Manajemen Produksi”, PT Perca, Jakarta, 2021.

Millenia, T, F, Sudarwadi, D, Nurlaela, “Pengendalian Persediaan Bahan Baku Menggunakan Metode EOQ dan MRP PADA CV. Ozone Graphics di Manokwari”, Jurnal Maneksi, vol 11, no 2, pp 322-331, 2022.

Abbas, S, R, Citraningtyas G, Mansauda, K, L, R, “Inventory Control of Drug with Economic Order Quantity (EOQ) and Reorder Point (ROP) Methods in X Pharmacy, District Wenang". Jurnal Pharmacon, vol 10, no 4, pp 927-932, 2021.

Purbasari, A, Irwan, H, Apostolic, W, “Analisis Perbandingan Metode Economic Order Quantity (EOQ) dan Periodic Order Quantity (POQ) dalam Pengendalian Persediaan Bahan Cutting Disk dan Carbon Gouging di PT. STP”, Profisiensi: Jurnal Program Studi Teknik Industri, vol 10, no 1, pp 1-16, 2022.

Fatma, E, Indriani, I, R, Fitriana, M, "Perencanaan Persediaan Komponen pada Perusahaan Original Equipment Manufacturer Menggunakan Metode Persediaan Deterministik Dinamis", Jurnal Spektrum Industri, vol 17, no 7, pp 23-30, 2019.

Khan, N, A, Sitania, F, D, Wahyuda, “Analisis Perbandingan Metode Least Unit Cost, Silver Meal, dan Metode Perusahaan dalam Pengendalian Persediaan Plafon PVC (Studi Kasus : XYZ)”, G-Tech: Jurnal Teknologi Terapan, vol 7, no 1, pp 155-164, 2023.

Madinah, W, N, Sumantri, Y, Azlia, W, “Penentuan Metode Lot Sizing Pada Perencanaan Pengadaan Bahan Baku Kikir dan Mata Bor”, Jurnal Rekayasa dan Manajemen Sistem Industri, vol 3, no 3, pp 505-515, 2015.

Asmal, S, Setiawan, I, Ikasari, N, Adriani, Y, “Inventories Analysis of Animal Feed Raw Materials by Using the Silver Meal Method and Wagner within Algorithm (Case Study of PT. XYZ Makassar)”, The 3rd EPI International Conference on Science and Engineering, vol 875, 2020.

Yuliastuti, E, Jauhari, W, A, Rosyidi, C, N, ”Pengendalian Persediaan Bahan Baku Kain pada Departemen Printing-Dyeing PT. Kusumahadi Santosa Karanganyar dengan Algoritma Wagner Whitin”, Prosiding, Universitas Sebelas Maret, 2015.

Ptak, A, C, CFPIM, CIRM, Smith Chad J, “Orlicky’s Material Requirement Planning Third Edition. Mc Graw Hill”, MC Graw Hill, 2011.

Published

2024-07-29

How to Cite

Abdullah, R., & Suseno. (2024). Efficiency Strategy for Procurement of Raw Materials for Side Beam for Bogie with Material Requirement Planning at PT XYZ. Jurnal Sistem Teknik Industri, 26(2), 218-227. https://doi.org/10.32734/jsti.v26i2.16402