Capacity Planning for Assembly Plant Unit PC1250 at Heavy Equipment Manufacturing Company
DOI:
https://doi.org/10.32734/jsti.v28i2.24889Keywords:
Aggregate Planning, Capacity Planning, Hybrid Method, Solver Excel Method, Transportation MethodAbstract
The rapid growth of Indonesia’s mining sector has triggered a critical capacity bottleneck on PT Komatsu Indonesia’s PC1250 production line. Current output is limited to 4 units per month compared to a projected demand of 7 units, resulting in an extreme overutilization rate of 256%. This study applies an Aggregate Planning strategy by comparing three methods: Transportation, Hybrid, and Excel Spreadsheet GRG, which were validated through the Master Production Schedule (MPS) and Rough-Cut Capacity Planning (RCCP). Analysis results show that the Excel GRG Method is the optimal solution with the lowest cost of IDR 132,649,508, more efficient than the Transportation Method (IDR 135,833,000) and the recruitment-focused Hybrid Method (IDR 403,365,672). Although current facility capacity is limited to approximately 1,461 hours (1,320 regular hours and 141 overtime hours), the optimal strategy bridges this gap by utilizing 1,408 regular hours, 395 overtime hours, and 1,383 subcontracted hours. This approach successfully meets the cumulative demand for 49 units without a backlog, reducing the utilization rate from 256% to a more sustainable 95%, thereby ensuring operational stability and maximum economic efficiency.
Downloads
References
[1] Y. Akanksha, “Laporan analisis ukuran, pangsa pasar, dan tren perlengkapan ekskavator berdasarkan jenis, industri, saluran penjualan dan wilayah prakiraan, 2022–2030,” 2024.
[2] E. H. Aghezzaf and A. Artiba, “Aggregate planning in hybrid flowshops,” Int. J. Prod. Res., vol. 36, no. 9, pp. 2463–2477, Sep. 1998, doi: 10.1080/002075498192634.
[3] E.-A. Attia, A. Megahed, A. AlArjani, A. Elbetar, and P. Duquenne, “Aggregate production planning considering organizational learning with case-based analysis,” Ain Shams Eng. J., vol. 13, no. 2, p. 101575, 2022, doi: 10.1016/j.asej.2021.09.002.
[4] G. Buxey, “Aggregate planning for seasonal demand: Reconciling theory with practice,” Int. J. Oper. Prod. Manag., vol. 25, no. 11, pp. 1083–1100, 2005, doi: 10.1108/01443570510626907.
[5] R. D. Chatare and V. D. Joshi, “Use of Excel spreadsheet GRG for minimizing the total transportation cost at a recently opened clothing boutique,” Splint Int. J. Prof., vol. 9, no. 2, pp. 124–129, 2022, doi: 10.5958/2583-3561.2022.00015.7.
[6] G. Fenny et al., “Aggregate planning to minimize cost of production of ABC Company with forecasting and master production schedule approach,” 2022.
[7] M. Gansterer, “Aggregate planning and forecasting in make-to-order production systems,” Int. J. Prod. Econ., vol. 170, pp. 521–528, 2015, doi: 10.1016/j.ijpe.2015.06.001.
[8] D. Ivanov, B. Sokolov, R. Hartl, and A. Pavlov, “Structure dynamics control-based integration of aggregate distribution and dynamic transportation planning,” IFAC Proc. Vol., vol. 46, no. 9, pp. 1920–1925, 2013, doi: 10.3182/20130619-3-RU-3018.00270.
[9] K. Kang, R. Y. Zhong, and A. Nassehi, “Integrated disassembly and assembly model for heavy duty equipment maintenance,” Procedia CIRP, vol. 93, pp. 995–1000, 2020, doi: 10.1016/j.procir.2020.04.086.
[10] M. Kwak, L. Kim, O. Sarvana, H. M. Kim, P. Finamore, and H. Hazewinkel, “Life cycle assessment of complex heavy duty equipment,” in Proc. ASME/ISCIE Int. Symp. Flexible Autom., 2012, pp. 625–635, doi: 10.1115/ISFA2012-7180.
[11] F. Lefta, L. Gozali, and I. A. Marie, “Aggregate and disaggregate production planning, material requirement, and capacity requirement in PT. XYZ,” IOP Conf. Ser. Mater. Sci. Eng., vol. 852, no. 1, p. 012123, 2020, doi: 10.1088/1757-899X/852/1/012123.
[12] F. Lefta, L. Gozali, and I. A. Marie, “Aggregate and disaggregate production planning, material requirement, and capacity requirement in PT. XYZ,” IOP Conf. Ser. Mater. Sci. Eng., vol. 852, no. 1, 2020, doi: 10.1088/1757-899X/852/1/012123.
[13] W. Y. Leong, K. Y. Wong, and A. Anjomshoae, “A systematic literature review of aggregate production planning (APP): Social and economic perspectives,” J. Ind. Eng. Manage., vol. 18, no. 1, pp. 48–71, 2025, doi: 10.3926/jiem.7927.
[14] C. Nivasanon, I. Srikun, and P. Aungkulanon, “Aggregate production planning: A case study of installation elevator company,” 2021.
[15] E. Noegraheni and H. Nuradli, “Aggregate planning to minimize cost of production in manufacturing company,” Binus Bus. Rev., vol. 7, no. 1, p. 39, 2016, doi: 10.21512/bbr.v7i1.1448.
[16] I. Nugraha, M. Hisjam, and W. Sutopo, “Aggregate planning method as production quantity planning and control to minimizing cost,” IOP Conf. Ser. Mater. Sci. Eng., vol. 943, no. 1, 2020, doi: 10.1088/1757-899X/943/1/012045.
[17] S. C. Stefan and I. Popa, Navigating Digitization and Internationalization in the New Global Economy, in Contributions to Management Science, O. Nicolescu et al., Eds., 2025.
[18] L. Sophie, “Demands, importance and potential of excavator tracking on earthwork construction sites,” 2022, doi: 10.18154/RWTH-2022-07733.
[19] M. Sultana, S. Shohan, and F. Sufian, “Aggregate planning using transportation method: A case study in cable industry,” Int. J. Manag. Value Supply Chains, vol. 5, no. 3, pp. 19–35, 2014, doi: 10.5121/ijmvsc.2014.5302.
[20] M. Trost, T. Claus, and F. Herrmann, “Social sustainability in production planning: A systematic literature review,” Sustainability, vol. 14, no. 13, 2022, doi: 10.3990/su14138198.
[21] J. Vidal, M. Lauras, J. Lamothe, and R. Miclo, “Toward an aggregate approach for supporting adaptive sales and operations planning,” in Proc. IEEE Int. Conf. Ind. Eng. Appl. (ICIEA), 2020, pp. 1031–1038, doi: 10.1109/ICIEA49774.2020.9102060.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 TALENTA Publisher Universitas Sumatera Utara

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
The Authors submitting a manuscript do so on the understanding that if accepted for publication, the copyright of the article shall be assigned to TALENTA Publisher Universitas Sumatera Utara as the publisher of the journal.
Copyright encompasses the rights to reproduce and deliver the article in all forms and media. The reproduction of any part of this journal, its storage in databases, and its transmission by any form or medium will be allowed.
















