PERENCANAAN DAN PENGENDALIAN KAPASITAS PRODUKSI PRODUK RAKITAN RADIO TIPE SOUNESS SNI 4250
DOI:
https://doi.org/10.32734/jsti.v20i1.383Keywords:
Production Planning and Control, Aggregate Planning, Capacity Planning, Rough Cut CapacityAbstract
Production system take an important role in industries, especially in manufacturing industries. This role determine the keys of successful company. Production process is an activity which produce finished product from raw material that involve machine, energy, and technique knowledge. Production process is real activity and can be seen by human being. The problems those always be faced in indutries management’s are the arrangement of production schedule, such lack of inventory or overstock once the settlement of production process isn’t on time. Production planning and control is activity to determine what product that will be produced, how many product that will be produced and how many labors needed in production processes. By using production planning and control’s method, those problems can be minimalized. Aggregate planning is one of production planning a.nd control’s method. By using this method, production planning could be done by using unit of replacement product so that the output of this planning isn’t declared in individual product. So, the output of aggregate planning isn’t planning in form of individual product but aggregate’s product. There are some strategies on aggregate planning such as pure strategy on aggregate planning and mixed strategy on aggregate planning. In this research, method of aggregate planning that used is optimization approach by linier rule. This method used to make long term planning and middle term planning. Long term planning consists of product forecasting and aggregate planning. The middle term planning consist of master production schedule and rough cut capacity planning. The result of this research is capacity needed and capacity available to determine which work center is drum and which isn’t. Conclusion of this research that capacity of each work center in perioad january to december 2018 is non drum. This indicate the good scheduling in capacity planning.
Downloads
Published
How to Cite
Issue
Section
Copyright (c) 2018 Jurnal Sistem Teknik Industri
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
The Authors submitting a manuscript do so on the understanding that if accepted for publication, the copyright of the article shall be assigned to TALENTA Publisher Universitas Sumatera Utara as the publisher of the journal.
Copyright encompasses the rights to reproduce and deliver the article in all forms and media. The reproduction of any part of this journal, its storage in databases, and its transmission by any form or medium will be allowed.