Relayout dengan Menggunakan BLOCPLAN Tool Analysis
DOI:
https://doi.org/10.32734/jsti.v22i1.2885Keywords:
Activity Relationship Chart, BLOCPLAN, Fractination, Refinery, Layout, Factory LayoutAbstract
PT. Industri Nabati Lestari or PT. INL is a subsidiary of PTPN 3 and PTPN 4 which is engaged in CPO processing. But from each production cycle, every raw material needed by PT. INL is not only supplied by PTPN itself, but many suppliers take part in the supply of raw materials. The problem faced by the company now is the inefficient flow of material in the current company layout from loading raw materials to the final product shipping process. Therefore the first thing is to observe the flow material problems, one of which is rearrangement or relayout using the ARC-BLOCPLAN method
Downloads
References
[2] Hadiguna, Rik A. 2008. Tata Letak Pabrik. Yogyakarta : Penerbit Andi
[3] I. A. Ahmad, D. Kartika, R. Kuncoro, and M. Emelda, “Pengolahan Produk Sirup Buah Mangrove,” 2016.
Published
How to Cite
Issue
Section
The Authors submitting a manuscript do so on the understanding that if accepted for publication, the copyright of the article shall be assigned to TALENTA Publisher Universitas Sumatera Utara as the publisher of the journal.
Copyright encompasses the rights to reproduce and deliver the article in all forms and media. The reproduction of any part of this journal, its storage in databases, and its transmission by any form or medium will be allowed.